
Last night Tomaso's hosted a thank you dinner for the members of the Cedarburg Fire Department. The food was great and highly appreciated.
Once the frame was done the body was ready to go on after being painted professionally.
Once the body was on reassembly went quickly. The front was put back on along with the metal rear bumper and metal deck. After the deck and front were put on the windshield and roof columns were reattached. Then the roof and roof rack was mounted. The custom seats came in and were mounted. The stainless steel was polished and mounted with the headlights. The large cabinet and the extinguisher was then mounted next. The front bumper came in and the was mounted after that. By this time the vehicle looked like this.(August 23) 


The ERV was taken back to the headquarter complex and shown to the membership at the September business meeting. It's first assignment was on September 11th at the varsity football game. At the game it was actually use for what it was designed to be used for to carry someone injured off the field.